Coal Power Plant Maritza I and II (Bulgaria)

| Construction Site: | Coal Power Plant Maritza I and II (Bulgaria) |
| Period: | 09/08 – 07/10 |
| Work: | Connection tubes ECO; SH3; RH2 in both boilers Piping cooling systems, HD-piping |
| Materials: | 16Mo3; St35.8; X10CrMoVNb9-1; X10CrWMoVNb9-2; 10CrMo9-10 |
| Staff: | average 80 Employee |




